Tianjin(GB)  |  Binhai(GB)  |  TJTV  |  Tianjin Free Trade Zone  | 

About Enorth.com.cn
  |  Chairman & President  |  Web Channels 
Home | News | Photo | Biz Tianjin | Travel in Tianjin | Learn About Tianjin | Talents in Tianjin | Binhai New Area
   

your position :enorth.com.cn > English > 滨海新区英文版 > 新区新闻 > 空客  content
The Airbus A320 general assembly line in the free trade zone will deliver 11 aircrafts this year
enorth.com.cn   2009-05-18 12:35

 

Following the delivery of the first aircraft this June, Airbus A320 general assembly line in Tianjin free trade zone will deliver 11 aircrafts this year. Of them 6 are A320, 5 are A 319. It is anticipated that the next year 24 aircrafts will be delivered. In 2011 the annual output will be 48 aircrafts.

At the International Aeronautical and Astronautical Forum Shows Tianjin China, some principal of Airbus said that on Sep. 28 2008 the Airbus A320 general assembly line Tianjin began formal production. This general assembly line is a third line after Airbus French and Airbus Germany, and the first Airbus general assembly line outside Europe.

This principal said, the production at the Airbus A320 general assembly line is in order as scheduled, and currently at the general assembly of Tianjin 8 aircrafts are being assembled. The first A320 aircraft has finished the spray-painting and the installation of engine. The second aircraft has finished spray-painting also, and is to be installed with engine.

As the single aisle aircraft most popular in the world, the Airbus A320 series include four types of planes, i.e., A321, A320, A319, and A318. In Tianjin two types, A319 and A320 will be assembled.


Editor:
 

Most Popular

Binhai heart to Tianjin's plans
Tianjin Tianlian to get 3b yuan injection
Tianjin: promoting the energy saving level through the optimization of structure and the improvement of awareness
Tianjin High-Tech Developmental Park improves independent innovation capacity
Tianjin builds 20 important service projects
Tianjin-Binhai Light Railway makes a breakthrough in passenger flow
Memory of An Jihe, Engineer of Tianjin Tiantie Group
Tianjin Railway Station Rebuilding Project to be finished in late 2007
Tianjin Petrochemical makes all-out to forge a state-level petrochemical base
Tianjin Binhai to attract foreign investment
Tianjin gives priority to the development of public transport
City card is available in Tianjin now
Tianjin Invests 14 Million yuan, Wuqing 180 Thousand Farmers No Longer Drink Fluoric Water
“General Director” Zhang Lili Wants to Build China’s Biggest Free Trade Zone
Tianjin: “Underwater Express” passing through Xidahu Lake

Editor: Zhang Jialu

Copyright (C) 2000-2008 Enorth.com.cn, Tianjin ENORTH NETNEWS Co.,LTD.All rights reserved